Planning a Split Headliner? Give Each Light Head Its Own Route Plan
Share
A split headliner needs a route plan for each light head. Start with the proposed star positions, divide the work into manageable groups, then check how the fibers from each group will reach their assigned head. Placing the modules first and hoping the strands reach can leave an awkward problem late in the job.
This is a planning discussion to have with an installer. It does not establish a safe mounting location behind any particular vehicle's headliner.
Draw the areas before the connections
Use a simple drawing of the usable headliner surface. Mark the overhead console, handles, visors and any roof openings before marking stars. Those details help keep the drawing tied to the actual panel instead of a rectangular ceiling that the car does not have.
Then draw rough groups around the proposed star points. For a two-head system, an installer might consider two groups. A different design may need another arrangement. These are fiber-routing groups; their existence does not mean the supplied controller offers independent brightness or color control for each group.
The VASTFIRE split kit has configurations with two, four or six light heads. The right grouping still depends on the roof and pattern. There is no need to force a symmetrical diagram if that creates a poor route around an opening.
Measure from the proposed head position
For each group, identify the farthest planned star point along the route the fiber would actually take. Include the path around obstacles and the approach to the module. A straight measurement across the visible roof can miss those changes of direction.
The fibers in the current split-kit configurations are listed as 1.5 m long. That length must suit the planned route before a strand is committed to a star point. More included strands do not solve an overlong route. Do not assume that leftover pieces can simply be joined to extend a run.
Keep the dimensions on the drawing, including any allowance the installer needs for handling, fixing and service. Our fiber-length planning guide explains why the route and the visible roof dimensions are separate measurements.
Give future servicing a place on the drawing
A module position can look convenient while the headliner is out and become difficult to reach once everything is assembled. Ask what would need removing to inspect that module and whether the controller's position is documented separately.
The installer also needs to confirm suitable clearances, secure mounting and the relationship to existing wiring, airbags and moving roof parts. Do not treat the empty-looking space in a photograph as evidence that a module belongs there.
Before approving the work, ask for one drawing that connects the star groups, light-head locations, controller and access points. Save it with the chosen configuration and installation records. If the proposed positions change during the job, update the drawing before the final trim goes back on; otherwise the useful record will describe a layout that no longer exists.